ypMs. Perez is an engineer with experience in engineering design and permitting services in both the
public and private sectors. She serves as the project engineer responsible for design and permitting for roadways, parking lots, paving, grading and storm drainage, water distribution, sanitary sewer collection and distribution, related calculations, cost estimates, and other associated site development work.

EXPERIENCE

Calvary Chapel of Fort Lauderdale:  Project Engineer for the 73 acre Calvary Chapel Church and School campus. Services provided include paving, drainage, signing and marking, water and sewer system design and permitting and construction observation for several phases of the project.

Terminal 4 at Port Everglades, in Hollywood, Florida: Project Engineer for services including design and permitting for the paving, grading, drainage, water and sewer systems for the Terminal parking lot, access roads, drop-off area, bus terminal and cargo truck delivery area.

New Life Baptist Church: Project Engineer for the CADD design for an 11 acre church. Services provided include paving, drainage, signing and marking, water and sewer system design and permitting and lift station design.

Florida Power & Light Substation (FPL), Port Everglades, Hollywood, Florida: Project Engineer for a 17.7 acre electrical substation facility located in Port Everglades in the City of Hollywood.  Services included paving, grading, drainage, signing and marking, and construction observation for the project

83rd PL Drainage Improvements: Project Engineer aiding drafting and design for a ± 380 linear feet french drain to resolve community flooding. The new system encountered conflicts with existing utilities and coordination with FPL and WASD was necessary. Services provided include signing and marking, paving and drainage connecting to the existing system.

Green Pathway: Participated in the design of a 2,500 feet long pathway along the NW 170th canal from 82nd Avenue to 78th Avenue. The project included incorporation of a drainage system with 9 drainage structures, over 2,000 linear feet of curb and gutter, signing and pavement marking.